Roughing In A Bathtub
Even if it seems like a simple task roughing in the plumbing for a bathtub drain is a job regulated by plumbing codes that vary widely by locality and a project best left to a qualified plumber.
Roughing in a bathtub. The point is simply to get the basic plumbing skeleton in place. You can then move on to connect water supply lines to the shower valve or bathtub faucet. It is not however difficult to understand the basics of the job and what it entails. In a shower only unit the faucet is placed higher at 48 inches off the floor.
The shower head normally is located 72 to. You will need to connect this discharge hole to the drain pipe with a sanitary tee. It should be between 10 and 14 from the floor. Once you ve assembled and installed the guts of the bathtub the rest of the bathtub plumbing rough in is straightforward.
Just like it sounds to rough in plumbing is essentially the rough draft to a later more finalized plumbing installation. Get the rough in right and you are 90 percent of the way there. The tub spout will generally be located 4 inches above the rim of the tub. Often the hardest part about plumbing is the rough in.
The p trap usually fits snugly in the space between the floor joists and you connect the drain to the rest of the bathroom plumbing and the vent to the vent network. The last step of connecting the sink toilet or tub is almost superfluous. Like a rough draft the job is incomplete at this stage but unlike a rough draft changes or alterations to the layout are not expected at this stage. Tub and shower valve rough in duration.
There are generally accepted plumbing rough in measurements for sinks toilets and tub showers. Chris gilliam man stuff 34 050 views.